Site analysis
Buying or owning land but unsure if you can build?
Save up to €30,000 on unnecessary documentation*
Discovering issues such as incorrect land-use designation or insufficient plot area only after submitting a building permit application can result in significant financial losses. You may need to substantially modify or completely discard the existing project, leading to additional costs for new documentation and resubmission.
*According to information available on Trebam.hr, the main design, which is the basis for obtaining a building permit, costs between €21 and €31 per m². The total cost of obtaining a building permit for a 200 m² house (preliminary and main design, geodetic survey, administrative fees, gas, water, drainage and electricity connections, and municipal and water contributions) ranges from €20,000 to €30,000, depending on the location and complexity of the build.
Avoid waiting 66 days for a rejected building permit**
The long average wait of 66 days for a building permit can lead to serious problems if deficiencies are discovered during the process. A possible rejection means you will be sent back to the beginning, where you will need to significantly modify or completely redraft the design documentation. In the worst case, you may discover that the type of construction you planned is not possible at your location, resulting in lost time, documentation costs, and potentially missed alternative investment opportunities.
**According to the Croatian Bureau of Statistics, 11,733 building permits were issued in Croatia in 2025, covering the construction of 21,809 dwellings with a total works value of €7.86 billion. Based on an analysis of data from the Ministry of Physical Planning, Construction and State Assets, the average wait for a building permit in the 34 cities using the eDozvola system was 65.6 days in 2025.
Mistakes
Avoid 6 common building mistakes
1
Land-use designation
The land is agricultural, not building land, which prevents any construction.
2
Insufficient plot area
Although the land is designated for building, it does not meet the minimum area requirements for a building permit.
3
Number of storeys
The planned project includes more storeys than permitted by the spatial plan.
4
Swimming pool
The spatial plan does not allow a swimming pool at your location, even though you planned one in the project.
5
Boundary setback
The planned building cannot meet the required minimum setback from the plot boundaries.
6
Parking spaces
The site conditions do not allow for the required number of parking spaces according to regulations.
Solution
Why can an architect help through a Site Analysis?
Legal responsibility
Under Article 70, Paragraph 1 of the Croatian Building Act (Official Gazette NN 153/13, 20/17, 39/19, 125/19, 145/24), the architect is responsible for confirming the correctness of the design documentation before submitting it to the competent authorities for permits.
Understanding regulations
Experience from numerous permit applications to public law bodies enables the architect to identify potential issues that could lead to permit rejection.
Feasibility assessment
The architect ensures the project complies with the spatial plan requirements, minimising risks and potential errors such as the 6 listed above.
Site analysis
Request a free Site Analysis
Questions & answers
Frequently asked questions
Before filling out the Site Analysis form
Can I request a Site Analysis before I buy the land?
Yes, and that is the best time for it. You find out whether the plot allows what you plan to build before you sign anything, so you do not risk buying land you cannot build on.
Where do I find the cadastral plot number and cadastral municipality?
Both are listed in the land register extract or the cadastral property sheet. You can also look them up for free, by address or on the map, in the public Uređena zemlja application: oss.uredjenazemlja.hr.
What if I do not know yet exactly what I want to build?
That is fine. You can skip the optional fields in the form, and the analysis will show what is possible on the site: which use, how many square metres and how many storeys.
If the legal ownership status is unclear, can I still apply for a Site Analysis?
Yes. The site analysis focuses on the spatial plan requirements, not ownership status. For ownership and legal issues, we recommend consulting a lawyer.
Can I buy land in Croatia as a foreign citizen?
EU citizens can generally buy property on the same terms as Croatian citizens. For citizens of other countries, it depends on reciprocity and approval from the competent ministry. Agricultural land has separate rules. As this is a legal question, we recommend checking with a lawyer.
Scope of services
What do you check in the Site Analysis?
We check the land-use designation, the minimum plot area, the permitted site coverage and floor area ratio, the number of storeys and building height, the setbacks from plot boundaries and the road, the conditions of access to the plot, the required parking spaces, and whether a pool and ancillary buildings are allowed.
How is the Site Analysis different from the location information issued by the city?
Location information is an official document that states which spatial plans apply to the plot and which zone it is in. Based on those plans, the Site Analysis checks what exactly you can build on your plot: which use, how many square metres and storeys, and where problems might arise.
Do you check road access and connections to water, electricity and sewerage?
We check road access, that is, whether the plot can be reached from a public road (a common reason for permit rejection). The conditions for connecting to water, electricity and sewerage are set when the preliminary design is submitted to the public authorities.
Do you also analyse existing buildings, for example for a reconstruction or a vertical extension?
Yes. For a built plot, we check to what extent an extension, vertical extension or reconstruction of the existing building is permitted under the spatial plan in force.
Is the Site Analysis a legal guarantee that I will receive a Building Permit?
No. The site analysis is a professional assessment of building possibilities based on current spatial plans and regulations, but it does not constitute a legal guarantee for obtaining a building permit.
Process and timelines
What happens after I fill out the Site Analysis form?
- We verify the accuracy of the entered data and get in touch by phone or email if we need additional information.
- Then we begin the analysis of the spatial plan requirements and existing regulations for your location.
- Once complete, we send you the analysis as a PDF document. If needed, we also arrange an online meeting to walk you through the analysis and the current status.
When will I receive the Site Analysis?
We deliver the site analysis within 5 to 10 working days of receiving complete data, depending on complexity.
What are the costs of a Site Analysis?
The site analysis is a free service we offer as a first step in collaboration.
Which areas do you cover?
All of Croatia.
Can I request an analysis for several plots at once?
Yes. If the plots are in the same cadastral municipality, enter them all in the "Cadastral plot" field, e.g. 123/45, 123/46. If they are in different cadastral municipalities, list the other plots in the "Additional information" field or fill out the form separately for each municipality.
In which language will I receive the Site Analysis?
In the language you fill out the form in: Croatian, English or German.
What if the spatial plan is being amended?
We base the analysis on the spatial plan currently in force. If amendments are in progress, we check the publicly available drafts and let you know if they could affect your project.
Next steps after the Site Analysis
What if building is not possible at my location?
In that case, we will explain the reasons and offer alternative solutions if available, such as changing the land-use designation or adapting the project.
Am I obligated to work with you after you prepare the Site Analysis?
No. The site analysis is free and does not oblige you to further collaboration. The decision is entirely yours.
What are the next steps if it turns out I can build?
Great, that is the most important first step! Next come the concept design, the main design and the building permit. We will gladly guide you through each of these steps, all the way to the occupancy permit. For more details, take a look at our services.
What if I have an additional question that hasn't been answered above?
Feel free to contact us via email at [email protected].